• Company
  • Products
  • Anwendungen
  • Service
  • Innovation
  • References
  • Career
  • Company
  • Products
  • Anwendungen
  • Service
  • Innovation
  • References
  • Career
  • Company
  • Products
  • Anwendungen
  • Service
  • Innovation
  • References
  • Career

Let's talk about your smart grid

Are you planning your rollout strategy, expanding existing installations, or preparing for future applications in the digital network space? Please use the contact form below to get in touch with us.

Tell us a little about your company and your current priorities. We’ll make sure your inquiry reaches the right team.

This is how we lay the groundwork for clear lines of responsibility, standardized procedures, and a high level of process reliability for the storage, transport, and installation of smart meter gateways.

Topics where we can help you

  • Smart Meter Rollout Strategies
  • Secure and reliable communication, such as via Powerline or LTE
  • Digitization of Distribution Networks
  • Operational Challenges in Large-Scale Rollouts
  • Future-proof energy infrastructure, prosumers, integration of flexibility, etc.

Get in touch

Please fill out the form below.

We will review your request and get back to you as soon as possible.

Contact Form





    [cleverreach cleverreach-sign-up “Subscribe to the newsletter”] (Language DEEN)

    News

    Discover the latest news from PPC—from press releases and project updates to insights on smart metering, grid digitization, and the energy transition.

    Successful Certifications of the New Production Facility Provide Capacity for Scaling Up the Smart Meter Rollout

    We are pleased that the certification process for our new production lines in Landau has been formally completed with the presentation of the certificate. This means that the new facility has been approved by the Federal Office for Information Security (BSI) for the production of certified smart meter gateways (SMGW). With the capacity expansion at the new facility to over 1 million SMGWs per year, we are ensuring that our customers have access to the quantities they need as the rollout of smart metering systems scales up. The way is now clear for a smooth scaling up of your rollout in line with the ongoing rollout targets for 2024 and the coming years.

    PPC and Zählerhelden Set New Standards with the Rollout of Thousands of CLS Devices

    The rollout of CLS devices is also picking up speed. SMGW market leader PPC and meter operator Zählerhelden from Dornstadt plan to install several thousand CLS gateways starting in April of this year. In addition to implementing Section 14a of the Energy Economy Act (EnWG) for end users, the joint solution focuses on other applications for market- and grid-oriented control.

    Bosch Home Comfort Group, Prolan, PPC, and Robotron are implementing market- and grid-friendly control systems in existing heat pump installations

    The Bosch Home Comfort Group, Prolan, Robotron, and PPC are taking a joint step forward in the energy-sector development of heat pumps. This collaboration demonstrates that today’s infrastructure—comprising heat pumps, control boxes, and iMSys—is already equipped to meet the grid-oriented requirements of Section 14a, and that market-oriented control and time-varying applications can be implemented via the SG-Ready standard.

    The SISSY Project Makes Taxes Under Section 14a Accessible to the General Public

    The SISSY innovation project was successfully launched at the turn of the year. The focus of this project, funded by the BMWK, is on further developing the intelligent metering system into a central, secure, and scalable gateway at the controllable grid connection point. The standards created through this project will soon make control in accordance with Section 14a of the Energy Economy Act (EnWG) feasible for large numbers of units, thereby making it cost-effective. The project partners are EGS, TMZ, Robotron, KEO, EEBUS, and PPC.

    Home power plant experts from E3/DC and SMGW pioneer PPC successfully put §14a standby operations to the test

    New requirements resulting from the amended Section 14a of the Energy Industry Act (EnWG) have been in effect since January 1, 2024. For E3/DC’s home power plants, their integrated energy management system, and PPC’s interoperable iMSysplatform, experts from both companies were able to demonstrate in tests that users not only meet the new requirements of Section 14a but will also be able to utilize additional market-related applications as well as grid- and system-supporting applications in the future.

    The WARAN Project is driving the heating transition and digitizing the district heating network

    While digitalization in the electricity sector has already gained momentum, the heating sector is still proceeding cautiously. There is a lack of transparency in local and district heating networks, a lack of control mechanisms to increase flexibility, and a lack of an integrated, holistic view of electricity and heat. As part of the WARAN research project, EWE NETZ, BTC, wesernetz Bremen, swb Erzeugung, be.storaged, SWR AG, the FfE, and PPC aim to advance these issues in municipal heat supply—specifically regarding sector coupling and digitalization—through a unified and standardized iMSys infrastructure.

    Events

    Meet PPC at upcoming trade events, conferences, and trade shows.

    Media Downloads

    Are you looking for PPC logos, images, or official brand materials? Visit our Brandhub to access media content and corporate design resources.

    This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.