• Company
  • Products
  • Anwendungen
  • Service
  • Innovation
  • References
  • Career
  • Company
  • Products
  • Anwendungen
  • Service
  • Innovation
  • References
  • Career
  • Company
  • Products
  • Anwendungen
  • Service
  • Innovation
  • References
  • Career

eSystems and PPC Implement a §14a Comprehensive Solution Ready for Mass Production

Since January 1, 2024, German distribution system operators have been required to reduce the power consumption of controllable consumer devices (SteuVE) to as low as 4.2 kW when necessary to support the grid. Transmitting the continuously variable dimming commands required for this has so far posed a challenge for the energy industry.

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.